200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh
220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

हमारी परियोजना

हमारी उद्योग विशेषज्ञता

कंपनी के आंकड़े

कुछ रोचक तथ्य

289

पूर्ण परियोजना

30

एमएसएफटी. पूर्ण

82

चालू परियोजना

कुछ रोचक तथ्य

120 से ज़्यादा प्रोजेक्ट पूरे हो चुके हैं और इमारतों और फ़ैक्ट्रियों के लिए 30 मिलियन वर्ग फ़ीट जगह विकसित हो चुकी है, हम काफ़ी तरक्की कर रहे हैं। वर्तमान में, हम 80 रोमांचक प्रोजेक्ट में सक्रिय रूप से लगे हुए हैं, जो वर्टिकल कंस्ट्रक्शन के भविष्य को आकार दे रहे हैं।

200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh

We constructed a new power station in Pampanurthanda (Bhanukota Village) and installed a double circuit power line from Hindupur to Pampanurthanda (Nuthimadugu) in Anantapur District. This helped improve electricity supply in the area.

CLIENT

AP TRANSCO

END DATE

Completed

220 kV Substation at Santhpur and 220 kV line from Halbarga to Santhpur, Bidar, Karnataka

Establishing 2X100 MVA, 220/110/11KV Sub-station at Santhpur in Aurad Taluk, Bidar District (ii) Construction of 220KV DC line on DC towers from the existing 220/110KV Halbarga Sub-station to the proposed 220/110/11 KV Santhpur Sub-station for a distance of 28.276 km in Aurad Taluk, Bidar District (iii) Construction of 110KV LILO line from existing 110KV Halbarga-Santhpur line to proposed 220/110KV Santhpur Sub-station for a distance of 1.357 Km in Aurad Taluk, Bidar District (iv) Construction of 110KV LILO line from existing 110KV Santhpur-Dongargaon line to proposed 220/110KV Santhpur Sub-station for a distance of 3.361 km in Aurad Taluk, Bidar District (v) Construction of 110KV DC LILO line on MC Towers from existing 110KV Santhpur-Janwada DC line to proposed 220/110KV Santhpur Sub-station for a distance of 2.75 km in Aurad Taluk, Bidar District (vi) Construction of 2 Nos of 220KV Terminal bays at the existing 220/110KV Halbarga sub-station for the proposed 220KV DC lines on DC towers from proposed 220/110/11 KV Santhpur Sub-station in Aurad Taluk, Bidar District

CLIENT

KARNATAKA POWER TRANSMISSION CORPORATION LIMITED (KPTCL)

END DATE

Completed On 2025

220KV DC Line from Maheswaram to Fabcity, Hyderabad

We're tasked with supplying, erecting, testing, and commissioning a 220KV double-circuit line spanning 23 km from Maheswaram 400/220KV SS to FAB City 220/132KV SS. Additionally, we're handling a multi-circuit line covering 10 km from Maheswaram to Dindi bonguluru LILO Line, along with installing two 220KV bays at FAB City's substation.

CLIENT

TS TRANSCO

END DATE

Completed

220KV MC line from Naraspur to Bowrampet, Hyderabad

We handle the full process: supplying, erecting, testing, and commissioning a 220KV multi-circuit line spanning 40 kilometers, connecting the Narsapur and Bowrampet substations in Rangareddy District.

CLIENT

TS TRANSCO

END DATE

Ongoing

220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

We built and expanded power infrastructure in Guntur District! This involved setting up a new 220/132KV substation in Guntur, extending bays at the Sattenapalli substation, and installing new lines to connect them. Additionally, we established a new 132/33KV substation at Ponnuru for better electricity distribution. Exciting times ahead

CLIENT

AP TRANSCO

END DATE

Completed On 2021

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

Supplying, installing, testing, and commissioning a 220/132KV substation in Pydibhimavaram, along with erecting 220KV and 132KV double circuit lines in Srikakulam district on a turnkey basis. Operations include a 2-year period post-commissioning.

CLIENT

AP TRANSCO

END DATE

Completed

Replacement of Insulators in the existing 400KV line at Nelamangala-Talaguppa, Shivamogga, Karnataka

Offering a comprehensive solution: replacing weakened Porcelain Disc Insulator Strings with Silicon Rubber Composite Polymer Long Rod Insulator Strings along the 400KV DC Talaguppa-Shanthigrama-Nelamangala Transmission line. Locations covered include those under Buy Back in Hassan and Tumkur Transmission Zones.

CLIENT

KPTCL

END DATE

Completed

OUR WORK

अन्य परियोजनाएँ

शीर्षक 2

कार्ट में जोड़ें

शीर्षक 2

कार्ट में जोड़ें

शीर्षक 2

कार्ट में जोड़ें

200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh

220 kV Substation at Santhpur and 220 kV line from Halbarga to Santhpur, Bidar, Karnataka

220KV DC Line from Maheswaram to Fabcity, Hyderabad

220KV MC line from Naraspur to Bowrampet, Hyderabad

220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

Replacement of Insulators in the existing 400KV line at Nelamangala-Talaguppa, Shivamogga, Karnataka