top of page

परियोजना जानकारी
.jpeg)
ग्राहक:
AP TRANSCO
We built and expanded power infrastructure in Guntur District! This involved setting up a new 220/132KV substation in Guntur, extending bays at the Sattenapalli substation, and installing new lines to connect them. Additionally, we established a new 132/33KV substation at Ponnuru for better electricity distribution. Exciting times ahead
220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh
परियोजना जानकारी
Prathipadu, Andhra Pradesh

कुछ रोचक तथ्य
परियोजना लागत
99 Cr
परियोजना स्थिति
Completed On 2021
55 Kms,
लंबाई
प्रोजेक्ट गैलरी
अन्य परियोजनाएँ
bottom of page

