top of page

परियोजना जानकारी

ग्राहक:

AP TRANSCO

We built and expanded power infrastructure in Guntur District! This involved setting up a new 220/132KV substation in Guntur, extending bays at the Sattenapalli substation, and installing new lines to connect them. Additionally, we established a new 132/33KV substation at Ponnuru for better electricity distribution. Exciting times ahead

220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

परियोजना जानकारी

Prathipadu, Andhra Pradesh

Bg for Testimonial.png

कुछ रोचक तथ्य

परियोजना लागत

99 Cr

परियोजना स्थिति

Completed On 2021
55 Kms,

लंबाई

प्रोजेक्ट गैलरी

अन्य परियोजनाएँ

bottom of page