top of page
पोलावरम बाईं मुख्य नहर वर्क्स, पूर्वी गोदावरी, आंध्र प्रदेश
श्रीपदा येल्लमपल्ली लिफ्ट सिंचाई परियोजना, रामागुंडम, तेलंगाना
जेएलएन नहर, रोहतक, हरियाणा

हमारी परियोजना

हमारी उद्योग विशेषज्ञता

SOME INTRESTING FACTS

With over 120 projects finished and 30 million square feet developed for buildings and factories, we're soaring high. Currently, we're actively engaged in 80 exciting projects, shaping the future of vertical construction.

कंपनी के आंकड़े

कुछ रोचक तथ्य

289

पूर्ण परियोजना

30

एमएसएफटी. पूर्ण

82

चालू परियोजना

Yeleru and Thandava Canal, East Godavari district, Andhra pradesh

In the East Godavari district of Andhra Pradesh, the Yeleru and Thandava Canal projects require the completion of balance surveying, investigation, sub-soil exploration, designs, engineering, and estimates. This includes the construction of remaining works such as canal bedding, lining, CM/CD works, and lift schemes.

CLIENT

WR Department of Andhra Pradesh

END DATE

Yet to be started

JLN Canal, Rohtak, Haryana

the JLN feeder canal in Haryana with a sturdy cement concrete lining using pavers. This will stretch over 79.47 km and help irrigate 81,284 hectares of land in Rewari, Jhajjar, Mahendragarh, and Rohtak districts.

CLIENT

Irrigation Department of Haryana

END DATE

Completed

Polavaram Left Main Canal Works, East Godavari, Andhra Pradesh

Conducting Detailed Investigation, preparation of Hydraulic particulars, Designs and Engineering, preparation of estimate and excavation of Main Canal, formation of Main Canal including canal lining and construction of CM & CD Works from Km 51.600 to Km 69.145 + 1009 m of Polavaram Irrigation Project Left Main Canal (Package No.03) - Part of works entrusted under Clause 60(C) of PS to APDSS – under EPC Turnkey System– shortfall in progress as per mile stone programme –Entrusting work to other agency under clause 60(C) – Entrustment of the balance work to M/S KMV Projects Limited, Hyderabad.

CLIENT

Water Resources Department, Andhra Pradesh

END DATE

Completed

Sreepada Yellampalli Lift Irrigation project, Ramagundam, Telangana

Sripada Yellampally Project- Lifting of water from foreshore of Sripada Yellampally Project to stabilize the tail end ayacut 20000 acres of 17L and 27L of D83 and to feed minor irrigation tanks under these canals of Ramagundam Mandal, Peddapally District.

CLIENT

Irrigation Department of Telangana

END DATE

Completed

Yeleru and Thandava Canal, East Godavari district, Andhra pradesh

JLN Canal, Rohtak, Haryana

Polavaram Left Main Canal Works, East Godavari, Andhra Pradesh

Sreepada Yellampalli Lift Irrigation project, Ramagundam, Telangana

अन्य वर्टिकल

हमारा काम

अन्य परियोजनाएँ

शीर्षक 2

कार्ट में जोड़ें

शीर्षक 2

कार्ट में जोड़ें

शीर्षक 2

कार्ट में जोड़ें
bottom of page