ग्राहक:
AP TRANSCO
Supplying, installing, testing, and commissioning a 220/132KV substation in Pydibhimavaram, along with erecting 220KV and 132KV double circuit lines in Srikakulam district on a turnkey basis. Operations include a 2-year period post-commissioning.
220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh
परियोजना जानकारी
Pydibhimavaram, Andhra Pradesh

कुछ रोचक तथ्य
परियोजना लागत
51 Cr
परियोजना स्थिति
Completed
50.7 Kms
लंबाई