top of page

परियोजना जानकारी

ग्राहक:

AP TRANSCO

Supplying, installing, testing, and commissioning a 220/132KV substation in Pydibhimavaram, along with erecting 220KV and 132KV double circuit lines in Srikakulam district on a turnkey basis. Operations include a 2-year period post-commissioning.

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

परियोजना जानकारी

Pydibhimavaram, Andhra Pradesh

Bg for Testimonial.png

कुछ रोचक तथ्य

परियोजना लागत

51 Cr

परियोजना स्थिति

Completed
50.7 Kms

लंबाई

प्रोजेक्ट गैलरी

अन्य परियोजनाएँ

bottom of page