PROJECT INFORMATION

Client:

AP TRANSCO

Supplying, installing, testing, and commissioning a 220/132KV substation in Pydibhimavaram, along with erecting 220KV and 132KV double circuit lines in Srikakulam district on a turnkey basis. Operations include a 2-year period post-commissioning.

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

PROJECT INFORMATION

Pydibhimavaram, Andhra Pradesh

Bg for Testimonial.png

Some Interesting Facts

Project Cost

51 Cr

Project Status

Completed
50.7 Kms

Length